PLTU SUMBAGSEL - 1
Technique: Bored Pile
PT Total Bangun Persada provide foundation work to ArthaGeo with bored pile method . In this bored pile work, the ArthaGeo team carried out a strategy that could produce 6 points that had been drilled with an average depth of 20 meters. the approximate area that we will work on in this project is 5000 m.
![PLTU SUMBAGSEL PLTU SUMBAGSEL](https://arthageo.id/wp-content/uploads/elementor/thumbs/PLTU-SUMBAGSEL-q6ww0bzxbkgcngc5ebv2fy9dzcw7rlztxzm2oq7798.png)