Nickel Smelter Construction

Technique: Bored Pile

Our ArthaGeo team was entrusted with the foundation area more than 3 km work by our client, PT Dexin Steel Indonesia.

The foundation work that we do with the bored pile method, this bored pile work is designed using a diameter 600 & 800 mm and an area more than length 1000 meters