Sulawesi Governor Office

Technique: Bored Pile

Brantas Abipraya was given foundation work to ArthaGeo with the bored pile method.

The work we are doing with a diameter of 800 mm and a total length of 5039 meters

 

BUILDING A BRIGHTER FUTURE